Skip to content

Pull requests: openssl/openssl

Author
Filter by author
Label
Filter by label
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Milestones
Filter by milestone
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Skip newly added blocked OAEP SHAKE testcases with old fips providers approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch triaged: bug The issue/pr is/fixes a bug
#24529 by t8m was closed May 31, 2024 Loading…
Remove the dead store in EVP_DecryptFinal_ex approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch cla: trivial One of the commits is marked as 'CLA: trivial' severity: ABI change This pull request contains ABI changes severity: fips change The pull request changes FIPS provider sources tests: exempted The PR is exempt from requirements for testing triaged: cleanup The issue/pr deals with cleanup of comments/docs not altering code significantly
#24526 by CoolThi was closed May 30, 2024 Loading…
DTLS 1.3: Re-enable mtu assertion which previously failed for DTLS 1.3 approval: ready to merge The 24 hour grace period has passed, ready to merge tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24524 by fwh-dc was closed May 30, 2024 Loading…
[Docs] SSL_*_use will increment reference counter approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.0 Merge to openssl-3.0 branch branch: 3.1 Merge to openssl-3.1 branch: 3.2 Merge to openssl-3.2 branch: 3.3 Merge to openssl-3.3 tests: exempted The PR is exempt from requirements for testing triaged: documentation The issue/pr deals with documentation (errors)
#24520 by ruslo was closed May 30, 2024 Loading…
1 task done
enable AES-XTS optimization for AIX approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch severity: fips change The pull request changes FIPS provider sources tests: exempted The PR is exempt from requirements for testing triaged: performance The issue/pr reports/fixes a performance concern
#24518 by sanumesh was closed May 30, 2024 Loading…
Fixes issue #24475 approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.0 Merge to openssl-3.0 branch branch: 3.1 Merge to openssl-3.1 branch: 3.2 Merge to openssl-3.2 branch: 3.3 Merge to openssl-3.3 tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24511 by coolshrid was closed May 30, 2024 Loading…
change inline to ossl_inline approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.3 Merge to openssl-3.3 severity: fips change The pull request changes FIPS provider sources tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24502 by sanumesh was closed May 28, 2024 Loading…
update configurable sigalgs documentation for providers approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.2 Merge to openssl-3.2 branch: 3.3 Merge to openssl-3.3 tests: exempted The PR is exempt from requirements for testing triaged: documentation The issue/pr deals with documentation (errors)
#24499 by baentsch was closed May 29, 2024 Loading…
Fix-24473
#24494 by cm-jones was closed May 25, 2024 Loading…
Fixes #24476 approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.0 Merge to openssl-3.0 branch branch: 3.1 Merge to openssl-3.1 branch: 3.2 Merge to openssl-3.2 branch: 3.3 Merge to openssl-3.3 cla: trivial One of the commits is marked as 'CLA: trivial' tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24488 by NekSaikou was closed May 28, 2024 Loading…
1 task done
VMS: Redefine _XOPEN_SOURCE_EXTENDED with the value 1 in apps/ocsp.c approval: done This pull request has the required number of approvals branch: 3.0 Merge to openssl-3.0 branch branch: 3.1 Merge to openssl-3.1 branch: 3.2 Merge to openssl-3.2 tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24471 by levitte was closed May 29, 2024 Loading…
VMS: Redefine _XOPEN_SOURCE_EXTENDED with the value 1 approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.3 Merge to openssl-3.3 tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24470 by levitte was closed May 29, 2024 Loading…
rand: remove unimplemented librandom stub code approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch tests: exempted The PR is exempt from requirements for testing triaged: cleanup The issue/pr deals with cleanup of comments/docs not altering code significantly
#24465 by xnox was closed May 24, 2024 Loading…
Fix potential memory leak in test_bad_dtls approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.0 Merge to openssl-3.0 branch branch: 3.1 Merge to openssl-3.1 branch: 3.2 Merge to openssl-3.2 branch: 3.3 Merge to openssl-3.3 tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24464 by amiremohamadi was closed May 29, 2024 Loading…
test: remove the just added, but now unrealistic, shake128 OAEP tests approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch severity: urgent Fixes an urgent issue (exempt from 24h grace period) tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24463 by xnox was closed May 22, 2024 Loading…
speed: Fix shake after commit "Intentionally break EVP_DigestFinal for SHAKE128 and SHAKE256" approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24462 by ifranzki was closed May 28, 2024 Loading…
uefi build fixes approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.2 Merge to openssl-3.2 branch: 3.3 Merge to openssl-3.3 severity: fips change The pull request changes FIPS provider sources tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24459 by kraxel was closed May 30, 2024 Loading…
fix potential memory leak OSSL_IETF_ATTR_SYNTAX_add1_value() approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24454 by Sashan was closed May 30, 2024 Loading…
signal.h included two times in demos/sslecho approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch cla: trivial One of the commits is marked as 'CLA: trivial' tests: exempted The PR is exempt from requirements for testing triaged: cleanup The issue/pr deals with cleanup of comments/docs not altering code significantly
#24445 by PiotrBzdrega was closed May 22, 2024 Loading…
Added an explicit yield (OP_SLEEP) to QUIC testing for cooperative threads approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.2 Merge to openssl-3.2 branch: 3.3 Merge to openssl-3.3 tests: exempted The PR is exempt from requirements for testing triaged: bug The issue/pr is/fixes a bug
#24443 by rsbeckerca was closed May 22, 2024 Loading…
[Docs] Default value for verification flags is 'SSL_VERIFY_NONE' approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.0 Merge to openssl-3.0 branch branch: 3.1 Merge to openssl-3.1 branch: 3.2 Merge to openssl-3.2 branch: 3.3 Merge to openssl-3.3 tests: exempted The PR is exempt from requirements for testing triaged: documentation The issue/pr deals with documentation (errors)
#24435 by ruslo was closed May 22, 2024 Loading…
1 task done
DTLS 1.3: Resolve cookie test todo approval: ready to merge The 24 hour grace period has passed, ready to merge tests: present The PR has suitable tests present triaged: feature The issue/pr requests/adds a feature
#24425 by fwh-dc was closed May 22, 2024 Loading…
1 task done
fips: explicitly setup cpuid when initialize approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch branch: 3.0 Merge to openssl-3.0 branch branch: 3.1 Merge to openssl-3.1 branch: 3.2 Merge to openssl-3.2 branch: 3.3 Merge to openssl-3.3 severity: fips change The pull request changes FIPS provider sources tests: deferred Tests will be added in a subsequent PR (label should be removed when the PR with tests is merged) triaged: bug The issue/pr is/fixes a bug
#24419 by ZenithalHourlyRate was closed May 20, 2024 Loading…
2 tasks
this change moves stack of compression methods, now global variable approval: ready to merge The 24 hour grace period has passed, ready to merge branch: master Merge to master branch severity: ABI change This pull request contains ABI changes severity: fips change The pull request changes FIPS provider sources tests: exempted The PR is exempt from requirements for testing triaged: refactor The issue/pr requests/implements refactoring
#24414 by Sashan was closed May 28, 2024 Loading…
ProTip! Type g i on any issue or pull request to go back to the issue listing page.